2020 FIELD WORK SEASONS

The 30th excavation season took place between October 12 and November 8, 2020. The work was focused on the upper levels of the West Sector assigned to MIS 5e, c. 120,000 years. In the North sector, our work was in the levels XIII to XV (MIS 7-8, c. 200,000 –…
11 January 2021

2019 FIELD WORK SEASONS

The twenty-ninth excavation campaign took place between August 20 and September 16. The work of the same focused on the upper levels of the West Sector between tables F1' to H1', a total of 4 m2 assigned to strata III (MIS 5e, c. 120,000 years). In the North sector, the…
11 January 2021

2018 FIELD WORK SEASONS

The twenty-eighth excavation campaign took place between August 20 and September 16. The work of the same focused on the upper levels of the West Sector between tables F1' to H1', a total of 4 m2 assigned to strata III (MIS 5e, c. 120,000 years). In the North sector, the…